Oving Neighbourhood Plan Consultation Statement
Reg 14 Consultation
Persons and bodies consulted
• Residents of Oving parish
• The public at large
• Five adjacent parishes
• 45 statutory consultees
• 10 landowners
How they were consulted
Consultation period October 28, 2024 to January 20, 2025. The consultation period was extended on three occasions: the first because of an error in one the maps, the second and third to provide additional evidence in support of the policies. Updates were made to the website and addendum sheets were provided for hard copies of the plan and published on parish noticeboards.
Since December 2020 when the Steering Group was formed and began work, we have kept residents informed of the development of the plan and the deliberations of the Steering Group via the parish website www.ovingcommunity.org.uk/neighbourhood-plan/. We have also published regular updates in the parish news magazine Oving District News. (see below)
Residents of Oving parish
Two public meetings: a Saturday morning in Oving village, a Wednesday evening in the new Shopwyke area developments.
A feedback leaflet delivered by a commercial distributor to all residents and businesses in the parish with a prize draw to encourage response
Copy of the PreSubmission plan placed in Chichester public library, reference section, Gribble Public House, Flip Out sports centre, Oving telephone kiosk.
The clerk had further copies to despatch on request.
Press release to Sussex World on October 28, 2024
Publication of the PreSubmission plan with feedback form on the parish website
Adjacent parishes, statutory consultees and landowners
By email letter directing them to the parish website
Landowners of land considered for designation as a Local Green Space were written to let them know of our intention and to ask if they had any objection. See sample letter below. Two landowners objected and their land was withdrawn from consideration.
Sample letter to landowner
Dear Sir/ Dear Madam
September 2025
Oving Neighbourhood Plan
Local Green SpaceThis is to let you know that we are in the process of preparing a Neighbourhood Plan for Oving parish. One of the policies designates land, including some we believe to be in your ownership, as local green space.
In designating land as local green space we are following the guidelines of the National Planning Policy Framework which specifies that local green space should be:
- In reasonably close proximity to the community it serves;
- Demonstrably special to a local community and holds a particular local significance, for example because of its beauty, historic significance, recreational value, tranquillity or richness of its wildlife;
- Local in character and not an extensive tract of land.
The status of local green space from a planning point of view is equivalent to green belt on which there are restrictions on development.
The land in question is the green space in Zone B on the map entitled Green Space map ABC attached.
The district council will be consulting on all the policies of the Neighbourhood Plan in the first half of 2026. This will give you and other landowners the opportunity to comment on proposed designations.
If there are comments you would like to make now, including whether the proposed designations have your support; we should be pleased to receive them.
Yours faithfully
Councillor Robert Stoner
Chairman, Oving Parish Council
Issues raised
by residents
Policy OV1: Employment
Like
- That it will not be harming wildlife
- No loss of existing business
- More opportunities for physically disabled do a desk job/ work remotely
- Create jobs for locals, essential part of NP
- Well considered for fitting for the parish
- Using existing business locations to increase density of employment
Dislike
- If building more business parks, do something about traffic and speed
- Lack of opportunities for the less able bodied
- Big corporations
- Very little public transport
- Economic benefit should never outweigh importance of environment or wildlife
- More employment would lead to more traffic on narrow roads
- Light pollution from Bartholomew business park
- Access by pedestrians and cyclists needs to be addressed
Policy OV2 New Local Services
Like
- A village shop if viable combined with meeting hub
- Keep the cowshed, use village hall for selling groceries and as a meeting hub
Dislike
- No new facilities as yet in Shopwyke Lakes
- No allotments in Shopwyke Lakes
- Need safe pedestrian/ cycle path access to Chichester
Policy OV3 Community Facilities
Dislike
- Waiting for the building by the sports field and the units under the flats opposite the sports field in Shopwyke to open
- Lack of central point to know about local information.
Policy OV4 Green Infrastructure network
Dislke
- Lack of insect highways in Shopwyke estate
- Lack of traffic management in Marsh Lane, no footpaths
- Threat from flooding and climate change
- Electrical charging points should be away from residential areas
Policy OV5 Local Green Spaces
Dislike
- No enforcement of dog ownership laws
- Who will pay to safeguard green spaces
- Visitors to play area/ pump track have nowhere to park
- Not enough trees on recreation ground
Policy OV6 Agricultural land
Like
- Essential for UK food sustainability, local employment and village character
- Land here is perfect for farming and must not be lost for development
- I support the policy
Policy OV8 Dark Skies
Dislike
- Orange light that dominates the sky at Merston
Policy OV9 Active and Sustainable Travel Network
Like
- Well served by buses
- Support the policy
- Top priority for connectivity
- How do you plan to keep Merston connected to Oving
- Need bus shelters
- Enhancing bus links reduces car usage
- Need regular bus service in Oving village
Policy OV10: High quality housing design
Like
- Need more housing but traffic needs sorting
- New developments all seem well planned and of good quality
- Good but shouldn’t interfere with old and traditional
- Adhere to the Oving Design Code
- In Merston changes need to contribute to/ not detract from the environment
- Needs to be in keeping with the area
- High quality design needs energy efficiency/ renewable energy
Dislike
- Not having infrastructure completed when houses are ready
- High quality needs to blend with surroundings
- Not ultra modern
- Need to appreciate the aesthetic quality of period buildings in the hamlet
- Focus on the identity of the village
Policy OV11 Conservation area
Dislike
- Heavy traffic shaking the buildings
Policy OV12 Local Heritage Assets
Like
- Support for the policy
Dislike
- Bartholomew’s crop research facility
Policy OV13 Tall buildings
Dislike
- Bartholomew’s crop research facility
Policy OV14 Affordable housing. Renumbered OV13
Like
- Need for more parking on adjacent roads
- Need rules for taking care of properties and gardens
- Need for continued use by existing local families
- Affordable housing should be in locations where there are amenities, schools, safe footpaths, shops with affordable food.
- Mix affordable and privately owned side by side
Dislike
- Shopwyke Lakes: Don’t build next to more expensive houses
- Needs to be more rentals especially for younger people
- Social landlords need to maintain properties to a good standard. Many don’t
General
Dislike
Parking in Highfield Lane
General comment
From Network Rail:
Proposals that increase or encourage the use of the level crossing at Drayton Lane should be resisted unless a suitable means of crossing the railway is proposed. Full consideration shall be given to this in conjunction with Network Rail.
by statutory consultees
Savills on behalf of the Church Commissioners (December 20, 2024) who own land within the designated Neighbourhood Plan area, object to Policy OV6 in relation to agricultural land. They argue that the policy as it stands is overly restrictive of development and propose some amendments to the wording to make it less so and align better with the NPPF.(National Planning Policy Framework)
West Sussex County Council (January 20, 2025). No concerns about the transport impacts of the Oving Neighbourhood Plan. In respect of the proposal to build 22 homes, it would need to be tested and refined through the Development Management process that itself would have to take account of the county Mineral and Waste plan. Reference should be made to this in the section on planning policy context. Suggested additional wording for two policies.
Suggestions for clarification of wording of the Objectives statement.
Recommends a glossary of key terms.
OV1 Employment. Allow part of the former fuel site for use as a waste site.
OV4 Green Infrastructure Network. May need revision in light of Policy A8
O8 Dark Skies WSCC supports Dark Skies. Cannot always be supported for highways safety reasons,
OV9 Active and Sustainable Network.
P27 A Last sentence may need to be reconsidered as the two types of route are not indicated on the Policies map.
P28 D Clarify ‘defined shared transport active travel route’
Obsidian Strategic Asset Management on behalf of landowners DC Heaver and Eurequity Limited (December 18, 2024) promoters of the land A8 East of Chichester with a planning application for 370 homes.
The ONP is in conflict with the NPPF in that it should support the strategic policies of the Local Plan, not undermine them.
Policy OV4 Green Infrastructure network would hamper the site’s development potential. Its requirement for biodiversity net gain (BNG) doesn’t sufficiently allow for a mix of on site and off site provision.
Policy OV4 D. The requirement for a medium distinctiveness multiplier in relation to BNG is out of line with Defra’s metric.
Policy OV6 Agricultural land doesn’t take account of the impact of gravel extraction on the quality of the land.
Policy OV8. Dark Skies. Insufficient evidence to justify the policy.
Policy OV9 Active and Sustainable Travel Network. Proposals for footpaths and cycles pass across wildlife corridor. Public access through the wildlife corridor resisted because of lack of safe movement along Drayton Lane.
Policy OV13 Tall buildings: change 9 metres to 12.
AL8 with 600 homes should be amended to A8 with 680 homes
Changes proposed to a number of other policies.
Conclusion
As it stands ONP contains policy conflicts that may hinder the deliverability of CDC’s strategic objectives.
Historic England (November 5, 2024)
No need to be directly involved in developing the strategy. Notes that the historic environment features throughout the draft.
Need for positive strategy for locally important heritage assets.
A glossary of historic environment terminology contained in the NPPF.
Advice on sources of information on how the character of an area may be protected: evidence gathering, design advice, policy writing.
Use of CIL funds to facilitate conservation of the historic environment, heritage assets and their setting.
NP offers opportunity to identify assets of community value {ACV) which offers additional level of control: eg public houses, libraries, museums, open green spaces.
New development needs to make a positive contribution to local character and distinctiveness.
A neighbourhood plan provides an opportunity to develop a positive strategy for assets not recognised at a national level.
Plan could include a list of non designated heritage assets (NDHA): historic buildings, sites, views, places of importance, setting out what factors make them special. A policy can give them a level of protection.
Source of guidance on local heritage listing: Historic England Advice Note 7 (2nd edition)
HE can provide advice on conservation area appraisal, designation and management.
HE can provide exemplar NPs, and links to some of these documents.
South Downs National Park Authority (January 14, 2025)
Supports OV7.B. Views to and from SDNP
Supports OV8 Prevention of light pollution
Supports Landscape Capacity Study’s recognition of long views to and from SDNP
Chichester District Council (December 20, 2024)
Review of factual accuracy, textual clarity, map clarity and content organisation, compliance with new Local Plan.
Policy on Agricultural land. Recommend removal in favour of protection provided by Local Plan.
Policy on landscape gaps. Recommend substantial revision of policy and supporting evidence with focus on local gaps.
Policy on Active and Sustainable travel contains cycling infrastructure at variance with A8 masterplan and wildlife corridor
Policy on Housing Design. Recommend up date Oving design codes and guidelines to take account of updated wildlife corridors.
Redefine Local Heritage Assets as non-heritage designated assets and have all buildings on the list assessed as such.
OV14 Policy on affordable house. Rewrite to comply with Local Plan and be less prescriptive. At some stage need for new housing needs survey
Southern Water
Comment from Ryan Lownds, Strategic Planning Lead, Southern Water.
‘Southern Water is the statutory waste water service provider for Oving. As such we would be grateful for more granular detail in the paragraph in Section 2 under ‘Planning issues outside the scope of the plan’. We would welcome detail in regard to which treatment works, what the issues are and the name of the site being tested against the improvements to the treatment works. This would allow us to provide commentary/ updates as required.’
Describe how those issues and concerns have been considered and where relevant addressed in the proposed Neighbourhood Development Plan.
Consultees
Savills. Objection to OV6 as being overly restrictive on development
CDC also objects to OV6 in favour of protection provided by Local Plan.
Response: Policy withdrawn
Obsidian: Policy OV4 D. The requirement for a medium distinctiveness multiplier in relation to BNG is out of line with Defra’s metric.
Response: The following clarification has been added to the clause:
“When calculating the multiplier score, it cannot be any less than medium as the Green Infrastructure Network identifies where all the most important parts are located that will score at least medium.”
Historic England: plan could include assessment of NDHA
CDC: Redefine Local Heritage Assets as NDHA and have all buildings assessed as such
Response: NDHA all assessed according to CDC/Chichester Council assessment methodology and included in Evidence Base
CDC: Landscape Gaps: revise policy with focus on local gaps.
Response: revised policy commissioned and added to Evidence Base
CDC: OV14. Rewrite to comply with Local Plan and less prescriptive.
WSCC: Building 22 homes: development needs to take account of WSCC Mineral and Waste Plan.
Response: Policy rewritten in compliance with Local Plan, less prescriptive and with no reference to 22 homes.
WSCC. Recommend include glossary of key terms.
Response: Under review
WSCC. OV1 Employment. Allow part of the former fuel site for use as a waste site.
Response: This is provided for under the Waste Local Plan.
CDC: Cycling infrastructure at variance with wildlife corridor.
Obsidian: OV9. Proposal for footpath and cycle path across wildlife corridor
Response: foot and cycle paths rerouted to alongside and to the north of railway line
CDC: OV9 High Quality Housing Design: update Design Housing Codes and Guidelines
Response: Codes and Guidelines updated and added to Evidence Base
Look at OV4 and green infrastructure BNG etc
SQ November 20, 2025
Reg 14 consultation report
Week of October 21
- Display of banners advertising open events
- Distribution by commercial agency to all households in the parish of flyer announcing open meetings, and feedback form
- Lodging of hard copy of the plan in public places: Chichester library, St Andrews church, Gribble public house, Flip Out Centre, Oving telephone kiosk

Copy of PreSubmission in Chichester Library
October 24-30
- Consultation of 45 statutory consultees, 10 landowners, five adjacent parishes, LPA
October 28
- Consultation opens
- Press release to Sussex World
October 29
- Consultation extended by two days to December 11 after error found in website copy of the plan
November 2
Open morning at Jubilee Hall, Oving. 40 in attendance
November 6
Open evening at Flip Out. 12 in attendance
November 14
- Oving Community Tea.
- Request to residents to study the plan and complete feedback form.


Open Morning Jubilee Hall, November 2, 2024
November 25, 2024
Added to evidence base:
- Landscape Capacity Study December 2021
- Consultation extended to January 6, 2024
December 9, 2024
Added to evidence base:
- Local Green Space Analysis Sheets
- Consultation extended by six weeks to January 20, 2025
Response from statutory consultees
Historic England (November 5)
December 13, 2024
Consulting residents on draft Vision and Objectives Spring 2021
What residents think
Fifty-three residents responded to our draft Vision and Objectives. We are grateful for the many considered opinions and thoughtful comments. This a synopsis of their thinking. It will be used to inform our planning policies that are now being drafted.
There is overwhelming concern about future development that could endanger the separate identity and semi rural character of the parish.
The more than doubling of the population resulting from the Shopwhyke Lakes and coming new estates south of Shopwhyke Road raise fear of Oving becoming a suburb of Chichester. The prospect of a further 1300 or so dwellings on adjoining sites, to meet as yet no known need, only exacerbates that fear.
If there has to be new development and some would be welcomed over the next 15 years, it should be ‘well considered, thought through’ and do nothing to increase urbanisation. Approval should be subject to the following conditions:
First, the necessary infrastructure put in place in advance, consisting of:
– A road network of high quality tarmac to reduce noise that can cope with the increased volume of traffic including heavy vehicles. The parish’s country lanes are unsuitable.
– Foot and cycle path networks, including paved stretches, that link the parish to Chichester and adjoining settlements, and provide connectivity within the parish itself.
– An improved bus service to cut car usage for travel to Chichester, Barnham and Arundel and to access local services including retail, school and health.
– A local farm shop (the business case has still to be examined)
Secondly, it should protect wildlife corridors and include substantial tree planting and hedges to promote biodiversity and carbon capture.
Thirdly, infill and new estates should be designed, using design codes as necessary, to be sympathetic to the ‘look and feel’ of the parish, including its historic buildings, and blend with its historic landscape.
Fourthly, affordable housing, rented, owned or partly owned, should be provided ‘proportionate to the size of the parish’ within new developments or on exception sites, to meet the needs of local residents and others with local connections.
The unique and historic quality of the parish owes much to its setting of open fields, trees and well managed farms. Residents are insistent that no development should be permitted on prime farm land. Specifically this includes land east of Drayton Lane.
As one respondent said, ‘It is irreversible. Once it is gone, it is gone.‘
Stephen Quigley
Chairman Oving Neighbourhood Plan Steering Group
June 11, 2021
Testing the Waters Report
Objectives
- Conduct informal consultation on the draft plan
- Provide an opportunity for residents to contribute to/ buy into the plan
- Make improvements to the plan
- Provide a trial run for the Reg 14 process
Duration
October 24 to November 9, 2022
Promotion
Distribution of leaflet to all residents giving the objectives of the plan and inviting to Open Days on October 29 (Oving Village Hall) and November 2 (Flip Out, Shopwyke). Posted on noticeboards.
Banners posted at high visibility locations in the parish
Information on the parish website, mail chimp and Facebook
Open Days
Exhibition of A1 posters on display stands providing an introduction to the role of a neighbourhood plan and summaries of the planning policies with maps showing where the policies would apply. Attendance: Oving village hall: 69; Flip Out 17.
Feedback
There were 40 residents who on line or using hard copy provided feedback. They were asked to say about each policy what they liked about it and what they disliked. Sponsors were obtained for a prize draw to incentivise feedback. At the Open Days there was further input from discussion with SG members and recorded on post-it notes.
The policies that attracted most comment were Housing followed by Getting About.
Issues raised under Housing included:
- Be innovative, not just traditional, in design and materials
- No three storeys except in blocks of flats, with care
- No gated or virtually gated communities
- Creeping urbanisation
- Bungalows for downsizers
- No large scale developments
- Wider range of affordable housing in terms of size and affordability
- Use blocks of flats to achieve higher density
Getting About
- Roads, already gridlocked, until A27 sorted, delay any new development
- ‘Terrifying slip road’ from Shopwyke Lakes to A27.
- Lack of strategic network improvements
- Quiet lanes for Marsh Lane and Colworth Lane
- Lack of transport system joining up footpaths and cycle ways to provide connectivity between Oving and Shopwyke.
Follow up
The Steering Group is analysing the feedback to identify comment that may deserve response and perhaps also inclusion in the plan, and comment already covered in the policies eg support for solar panels. In general there was considerable endorsement of the individual policies, the plan’s overall approach and the quality of the Open Day presentations.
SQ November 17, 2022
Analysis of feedback and proposed response by Steering Group at its meeting on January 13, 2023.
Footpath needed between Littlemead and the Taylor Wimpey development. Needs clearer highlighting on network policy map.
Tall building policy. Agreed not to specify measures for heights to eaves or ridges. Better to include a narrative that any industrial building outside an HDA that was subject to separate policies should be assessed in terms of impact on adjoining landscape and development.
Building Heights to be two storey maximum, lower in highest sensitivity areas within the Landscape Sensitivity Areas Report. Reasoning and explanatory notes based on Historic England’s advice below at
Restricting HGVs to A and B roads. For future development, this restriction should be set within an S106 or planning condition with access to the development site from the A or B network via the least restricted route (ie away from Oving High Street, Marsh Lane and Colworth Lane). Seek TRO on non A and B routes to support non motor based transport.
Protecting trees in landscape boundaries. Action Appoint consultant to recommend individual trees for TPOs.
Concerns relating to bungalows, affordable housing, building materials and solar energy. It was noted that all these were covered in the AECOM Oving Guidelines and Codes Report of January 2022. It was recommended that a link be provided to this report for ease of reference.
Provide protection for mature trees, hedges and wooded verges. This concern was broadly covered in the AECOM report. Code.15 Trees. Page 57.
Manned work hubs, providing facilities for small business. This concern could easily be inserted in Policy OV1.
Clean energy policy. It was agreed not to develop such a policy as it would be subject to NPPF requirements which themselves would be subject to change. Also the subject was largely covered passim in the AECOM report eg Code 27 Minimising energy use Page70.
Stephen Quigley
Chairman, Oving Neighbourhood Plan Steering Group
February 1, 2023
Oving District News
ODN articles on Oving Neighbourhood Plan
Historic ODNs are available on the community website, on this page:
https://www.ovingcommunity.org.uk/community/oving-district-news
Issues containing articles on the Oving Neighbourhood Plan:
- Winter 2025
- Summer 2025
- Spring 2025
- Winter 2024
- Summer 2024
- Spring 2023
- Winter 2022/ 23
- Spring 2022
- Winter 2021
- Summer 2021
- Late Summer 2020
- Spring 2020